01About these terms
These terms and conditions apply to the website effectiveeco.com and to all surveys, quotations and installation work carried out by Effective Eco Limited, 435 Stratford Road, Shirley, Solihull, West Midlands, B90 4AA ("we", "us", "our").
They cover solar panels, battery storage, heat pumps, insulation and any related products or services we supply. Your written quotation and these terms together form our contract with you. If anything in your quotation differs from these terms, the quotation takes priority.
02Surveys & quotations
- Our quotations are based on the information you give us and on what we see during the survey, whether in person or remote.
- A quotation is valid for the period stated on it. After that, prices may change in line with product and labour costs.
- If we find something during installation that could not reasonably have been seen at survey, such as hidden roof damage, structural issues or electrical faults, we will tell you before doing any extra work and agree any additional cost with you first.
- System designs, savings estimates and drawings we provide remain our property until the contract is paid in full.
03Your contract with us
A contract is formed when you accept our quotation in writing, by signing it, confirming by email or paying a deposit. We will then confirm the order and agree an installation date with you.
Please check your quotation carefully before you accept it, including the products, system size, location of equipment and the total price.
04Prices & payment
- All prices are shown in pounds sterling and include VAT at the applicable rate unless stated otherwise.
- Any deposit, stage payments and the final balance are set out in your quotation, together with when each one is due.
- Where you pay through a finance provider, the finance agreement is between you and that provider and is subject to their own terms.
- If a payment is late, we may pause work, delay commissioning or hold back certification documents until it is received. We may also charge interest on overdue amounts as allowed by law.
05Your right to cancel
If you are a consumer and the contract was agreed away from our premises or at a distance, you have the right to cancel within 14 days of the contract being formed, without giving a reason, under the Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013.
- To cancel, tell us clearly in writing through our contact page or by post to our address.
- We will refund any payment you have made within 14 days of receiving your cancellation.
- If you ask us to start work during the cancellation period and then cancel, you will need to pay for work already carried out and any products ordered specifically for you.
- If you cancel after the 14-day period, we may charge reasonable costs we have already incurred, such as design work, applications and non-returnable products.
06Grants & funding
Where you are applying for a grant or funding scheme, such as ECO4, the Boiler Upgrade Scheme or a local authority scheme, we will help you with the application, but approval is decided by the scheme provider, not by us.
- We cannot guarantee that any grant will be approved, or the amount or timing of any funding.
- Schemes may change or close without notice. If funding is refused or withdrawn, we will discuss your options before any work starts.
- You must give accurate information for any application. Funding may be reclaimed if information turns out to be incorrect.
07Your responsibilities
- Give us safe and reasonable access to your property, roof space, consumer unit and work areas on the agreed dates.
- Make sure you own the property or have permission from the owner, landlord, freeholder or mortgage lender for the work.
- Tell us about any planning restrictions, listed building status, conservation area, asbestos or other hazards you know of.
- Clear the work areas and protect or remove fragile and valuable items.
- Provide electricity and water where needed during installation.
If we cannot carry out work on an agreed date because access was not available, we may charge reasonable costs for the wasted visit.
08Installation
- We will carry out all work with reasonable care and skill, in line with MCS, TrustMark and PAS 2035 standards where they apply, and with current building and electrical regulations.
- Installation dates are estimates. We will keep you updated, but we are not responsible for delays caused by weather, scaffolding, supply shortages, DNO approval or other events outside our control.
- Where required, we will notify your Distribution Network Operator (DNO) and register your system with MCS. Some systems need DNO approval before they can be connected or exported.
- We will leave the work areas clean and tidy and take away packaging and waste from our work.
09Performance & savings
Any energy generation, savings or payback figures we give are estimates based on MCS methods and the information available at the time. Actual results depend on weather, shading, your energy use, tariffs and other factors outside our control, so they are not guaranteed.
10Ownership & risk
Products we supply become your property once you have paid for them in full. Risk in the products passes to you once they are delivered to or installed at your property. Until full payment is received, we keep the right to recover any unpaid products.
11Warranties & aftercare
- Products are covered by the manufacturer warranties stated in your quotation and handover pack.
- Our workmanship is covered by the workmanship warranty set out in your quotation.
- Warranties do not cover damage caused by misuse, accidents, severe weather, alterations or repairs by others, or failure to follow the manufacturer's instructions.
- These warranties are in addition to your legal rights as a consumer under the Consumer Rights Act 2015.
12Our liability
- Nothing in these terms limits our liability for death or personal injury caused by our negligence, for fraud, or for anything else that cannot be limited by law.
- We are responsible for loss or damage you suffer that is a foreseeable result of us breaking this contract or failing to use reasonable care and skill.
- We are not responsible for loss that was not foreseeable, for business losses where you are a consumer, or for loss caused by events outside our reasonable control.
- For business customers, our total liability is limited to the price paid under the contract, except where the law does not allow this.
13Complaints
If you are unhappy with any part of our service, please contact us first through our contact page and we will do our best to resolve it quickly. If we cannot resolve your complaint, you may be able to refer it to TrustMark or the consumer code body linked to our MCS certification for independent dispute resolution.
14Use of our website
- The content on this website is for general information only and does not form an offer or advice for your specific property.
- We try to keep information accurate and up to date, but we do not guarantee that it is complete or free from errors.
- All text, images, logos and designs on this website belong to Effective Eco Limited or our licensors and may not be copied without our permission.
- You must not misuse the website, including by introducing viruses or attempting to gain unauthorised access.
- Links to other websites are provided for convenience. We are not responsible for their content.
15Privacy
We handle your personal data in line with UK data protection law. Please read our Privacy Policy to see how we collect, use and protect your information.
16Changes & governing law
We may update these terms from time to time. The version that applies to your installation is the one in force when you accepted your quotation.