Mr Tank Farquhar Rd Edgbaston
4KW Solar PV installation over 2 arrays ; one on the main roof and the other on a ground floor level flat roof thereby optimising generation
Mr Tank ‘Leicester’
A very bespoke Installation including a 4KW Solar PV - a flat roof installation onto an outbuilding to the rear of the garden. Boiler and Heating...
Mr & Mrs Pettit ‘Solihull’
Installation including 4KW Solar PV, Boiler & Heating Controls with no contribution by client resulting in substantial instant energy savings
Mrs Kaur ‘Birmingham’
Installation the client including 3.5KW Solar PV, Boiler & Heating Controls with no contribution by client resulting in substantial energy savings
Private Residence ‘Cleobury Mortimer’
A Premium 4KW installation onto the roof of an old barn that has been completed rebuilt set within substantial grounds.
Private Residence
A bespoke Installation on a unique residence that is set within 300 acres
Mr & Mrs Ellis, Market Drayton
As the residential location comprises of a series of Barn conversions that are of a listed nature, full planning consent was sought and granted...
Mr. Chana, Solihull
A typical example of perfect setting out to avoid any shading with the original install being a 3KW system and subsequently increased to 4KW - all...
Mr Gujral – Frederick Road, Edgbaston
A highly specialized installation on a flat roof using a state of the art flat roof mounting system that is non-penetrative to the roof membrane...
Mr & Mrs Evans – Neath, South Wales
A very challenging installation that called for a specific scaffolding solution due to restrictive site conditions.