Betts Metals, Kidderminster
Very demanding installation as full planning consent was obtained together with D.N.O. (District Network Operator) approval together with the design of a totally bespoke structural engineering solution to deal with excessive wind uplift due to extreme local topographic conditions. This resulted in the installation of a Premium 50KW Solar PV system after having implemented a detailed Risk Assessment, Method Statement and the provision of full Project Management.